Software & Integration
Legacy software modernization without a risky switchover
Legacy software modernization is replacing an aging business system, such as an AS/400 application, a Microsoft Access database, a FoxPro or Visual Basic 6 program, or an old ERP, with modern software that does the same job. It's for companies whose old system still works but depends on one person, can't connect to anything new, or can't be supported much longer. We do it gradually: connect to the old system first, then replace it one screen, report or workflow at a time while the business keeps running.
Based in San Diego. On-site across San Diego County, Orange County, Los Angeles, the Temecula Valley and the Inland Empire, and remote for companies anywhere in the US.
Why big-bang replacements go wrong
The usual advice is to pick a new system and switch over on a weekend. For a company that has run on the same software for twenty years, that means reproducing two decades of rules, customizations and habits in one go, and finding out what was missed when customers call on Monday.
Meanwhile the risk of doing nothing grows. The person who understands the old system gets closer to retirement, the hardware gets harder to replace, and every new tool the business wants has to be bolted on by hand.
How companies handle it today
- A green-screen or Access system only one or two people can change
- Spreadsheet workarounds for everything the old system can't do
- A PC or server kept running because the software won't move
- A replacement quote that is too expensive and too risky to sign
- New tools, such as a customer portal or AI, put off because nothing connects
Connect, then replace one piece at a time
We start by connecting to the old system and copying its data into a modern database you own, without changing the system itself. That alone makes the data usable: reports, integrations and new screens can be built on the copy.
Then we replace the old system in phases. Each phase moves one screen, report or workflow to modern software, quoted and approved on its own. The old system keeps running for everything not yet moved, and you can stop after any phase with what was built still working.
- The old system keeps running until you decide otherwise
- Your data moved into a modern database you own
- Business rules recovered from the old system and written down
- No single go-live weekend
Examples
Three examples
Illustrative example · fictional company
Bayview Plumbing Wholesale
A plumbing distributor in Chula Vista
- The situation
- Order entry, pricing and inventory ran on AS/400 software from the 1990s, maintained by one outside contractor.
- What gets built
- A nightly copy of the AS/400 data into a modern database, then a web order lookup for the counter, then a new pricing screen that writes back through the system's own import.
- What changes
- The counter works in modern screens for the jobs they do most, and the AS/400 keeps running underneath while the next phase is planned.
Illustrative example · fictional company
Red Willow Nursery
A wholesale nursery in Fallbrook
- The situation
- Availability, orders and grower records lived in a Microsoft Access database built in 2003.
- What gets built
- The Access data moved into a modern database, with the weekly availability list and order entry rebuilt as web screens one at a time.
- What changes
- Staff use the new screens for orders and availability, while older reports stay in Access until their turn comes.
Illustrative example · fictional company
Copperline Machining
A contract manufacturer in Anaheim
- The situation
- Job costing ran on a Visual Basic 6 program whose author had retired.
- What gets built
- The program's data and calculations documented and moved into a modern job-costing tool, checked against the old results on real jobs before the switch.
- What changes
- Job costs match what the old program produced, and the calculations are now written down and maintainable.
Integration approaches
How we connect to your systems
Database access
Read-only connections to DB2 on IBM i, Access and FoxPro files, or the SQL Server behind older ERPs.
Files and exports
Scheduled exports and reports the old system already produces, picked up and loaded automatically.
Screen-level reading
For systems with no other way in, software reads the screens the way a trained employee would.
Write-back through the system's own tools
Where new screens must update the old system during the transition, we use its own import or entry functions rather than writing to its database directly.
Scheduled sync
The modern copy kept current through the transition, so old and new screens work from the same numbers.
We are independent: no official vendor partnerships, certifications or prebuilt connectors are claimed. Each connection is built for your systems, under accounts and access you control.
Security basics
Careful by default
- Read-only access to the old system by default
- Write-back only through the system's own import or entry functions, after approval
- Old and new results compared on real data before any switch
- Full backups of the old system before each phase
- No AI changes financial or inventory records without a person's approval
Process
How a project runs
Step 1: Free consultation
What the old system does, who depends on it, and what worries you most about it.
Step 2: Technical discovery
The system, its data and its hidden rules mapped in writing, with a phase plan and a quote for phase one.
Step 3: Connect and copy
The data copied into a modern database you own and kept current from the old system.
Step 4: Replace in phases
One screen, report or workflow at a time, tested against the old system before staff switch over.
What you get
- Your data in a modern, documented database
- A written map of the old system's rules
- New screens and reports, one phase at a time
- A plan for retiring the old system, or for keeping parts of it
Pricing
What it costs
Modernization starts with technical discovery. Each phase after that is quoted and approved on its own.
Technical discovery & architecture
- Implementation
- From $1,500
- Monthly
- No monthly fee
A paid, hands-on study before a larger build: how your systems work, how we would connect to them, and what it will cost.
Legacy software modernization
- Implementation
- From $15,000
- Monthly
- Based on scope
An old system replaced gradually, one screen, report or workflow at a time, while it keeps running.
Third-party subscriptions, hosting, and AI usage costs are billed separately.
FAQ
Common questions
Do we have to replace the whole system?
No. Some companies replace everything over time; others modernize the screens people use every day and leave the old system running in the background for years. Both are reasonable.
What is AS/400 modernization?
Replacing or extending software that runs on an IBM i (AS/400) system. We usually leave the AS/400 running at first, copy its data into a modern database, and move screens off it one at a time.
How long does modernization take?
It depends on the system, and it is spread out on purpose. The data connection usually comes first, within weeks; each later phase is planned so staff can switch over without disruption.
What if nobody understands the old code?
That's common. We recover the rules from the code where it's available, and from the data and the people who use the system where it isn't, and write them down before anything is replaced.
How much does legacy modernization cost?
Legacy software modernization starts from $15,000. Technical discovery, from $1,500, comes first and produces the phase plan and the quote for phase one. Third-party subscriptions, hosting, and AI usage costs are billed separately.
Can we add AI before modernizing?
Yes, and many companies start there. Once the data is connected, AI can answer questions and draft work from it while the old system is still running.
Plan the first phase
Book a free system consultation. We'll look at your old system, tell you how we'd connect to it, and what a sensible first phase would be.
On-site across Southern California, and remote anywhere in the US.
Related services
Industries